The Cabinet has denied reports claiming that Egypt will pay $50 million to repair the Energos Winter floating storage and regasification unit (FSRU), which was set on fire resulting from a drone attack at Damietta Por...
Prime Minister Mostafa Madbouly chaired the cabinet’s weekly meeting, where the focus was on the latest updates on the fire that affected a floating storage and regasification unit (FSRU) and a storage vessel at Damie...
A drone strike caused a fire aboard two vessels at Damietta Port on July 29, 2026, according to preliminary investigations by Egyptian authorities, noted a statement by the Cabinet. “Emergency response teams suc...
Iraq has signed a $450 million investment agreement with US-based Excelerate Energy to construct the country’s first floating storage and regasification unit (FSRU) at the port of Khor al-Zubair, officials told Reuter...
Jordan received on Friday the Energos Force floating, storage, and regasification unit (FSRU) at its Aqaba port, ahead of its connection to the Arab Gas Pipeline. The unit is set to commence operations next Tuesday, f...
Minister of Petroleum and Mineral Resources Karim Badawi conducted an inspection tour at the “Tahya Misr” berth in the Alexandria Port to check the progress of the “Energos Power” Floating Stor...
Prime Minister Mostafa Madbouly led an inspection tour to follow up on developments in preparing the infrastructure at Ain Sokhna port so that the second FRSU to start operations. Madbouly began his tour by inspecting...
The Minister of Petroleum and Mineral Resources, Karim Badawi, toured the SUMED and Sonker ports in Ain Sokhna, accompanied by senior officials from the petroleum sector. The visit focused on assessing the preparation...
Minister of Petroleum and Mineral Resources, Karim Badawi, accompanied by leaders from the Ministry and the Egyptian Natural Gas Holding Company (EGAS), witnessed the arrival of a new Floating Storage and Regasificati...
The Egyptian Natural Gas Holding Company (EGAS) has signed a 10-year charter agreement with Höegh Evi for the deployment of Hoegh Gandria as a floating storage and regasification unit (FSRU) in the fourth quarter (Q4)...