Petroleum Development Oman (PDO) | Egypt Oil & Gas

PDO Drills the 1,000th Well at RTQ Cluster

Petroleum Development Oman (PDO) drilled the 1,000th well at Marmul-Rahab-Thuleilat-Qaharir (RTQ) cluster located in South Oman.

PDO Awards Petrofac $75 M Procurement Contract

Petroleum Development Oman (PDO) has awarded Petrofac the procurement services project for the Mabrouk North East Line Pipe in Oman.

Oman’s PDO to Boost Oil Production

Petroleum Development Oman (PDO) plans to increase oil production to reach 670,000 b/d over the upcoming five years.

Shell, Total, Oman Ink Upstream Agreements

Shell and Total inked an upstream agreement with Oman; under which the companies will invest in gas exploration and production in partnership with Petroleum Development Oman (PDO) and Oman Oil Company (OOC).

Marubeni to Build 105 MW-Solar Powered Plant in Oman

Marubeni Corporation, which leads a Japanese-Omani consortium, was selected by Petroleum Development Oman (PDO) to construct a 105 megawatt (MW) solar-powered plant in Oman.

Petrofac Awarded $115M EPC Contract from PDO

Petrofac has been awarded a $115 million engineering, procurement and construction (EPC) contract by Petroleum Development Oman (PDO) for developing and supporting oil extraction from the Qarn Alam generator proje ...

Bilfinger’s Omani JV Wins PDO Extension Contract

Germany-based Bilfinger said its Oman joint venture (JV) has won an extension of its contract to provide engineering and maintenance services to oil and gas company Petroleum Development Oman (PDO).

Oman, Japan Signed Pipe-Supply Contract

Petroleum Development Oman (PDO) signed a $1.2b contract with Japanese supplier Sumitomo to supply piping for its drilling operations through Duqm.

Oman Pro-Rated Oil Output Cuts

Omani Ministry of Oil and Gas has set an output limit on producers in Oman. The 45,000b/d output cut will be shared by the Sultanate’s oil producers on a pro-rate basis.

PDO Signed $200m Supply Contract

Petroleum Development Oman (PDO) has signed a $200m pipe supply contract for four years with an Omani factory as part of its in-country value (ICV) strategy.

Page 1 of 2

Login

Welcome! Login in to your account

Remember me Lost your password?

Don't have account. Register

Lost Password

Register