PMS, Deep Tech Develop Emergency Plan for Zohr
Petroleum Marine Services (PMS) alongside Deep Tech led an engineering alliance to develop a rapid emergency intervention plan for the Zohr project at a depth of 1,500 meters below sea level.
Petroleum Marine Services (PMS) alongside Deep Tech led an engineering alliance to develop a rapid emergency intervention plan for the Zohr project at a depth of 1,500 meters below sea level.
Belayim Petroleum Company (Petrobel) has submitted an early termination of the Trident 16 contract with Shelf Drilling.
Belayim Petroleum Company (Petrobel) allowed a one-year extension for Shelf Drilling contract for Trident 16 jack-up rig.
The exploration wells, Baltim Southwest-1 and Baltim Southwest-2, in the Nile Delta region began production with a rate of about 190 million cubic feet per day (mcf/d) and about 1,300 barrels of condensate per day ...
Eni announced the discovery of new resources in the Abu Rudeis Sidri development lease in the Gulf of Suez, where Petrobel, equally held by Eni and the Egyptian General Petroleum Corporation (EGPC), drilled an app ...
As the Mediterranean Offshore Conference and Exhibition (MOC 2019) comprised a number of abstracts and presentations from international oil companies (IOCs), Osama El Bakly, Chairman of Egyptian Natural Gas Holdin ...
Zohr field’s total investments reached $10.6 billion, of which $3 billion were injected in fiscal year (FY) 2018/2019 after the field reached a production level of 2.7 billion cubic feet per day (bcf/d).
The average production of Belayim Petroleum Company (Petrobel) has exceeded a record 803,000 barrels of oil equivalent per day (boe/d).
Tarek El Molla, the Minister of Petroleum, announced that the production capacity of Zohr gas field has raised to 2.7 billion cubic feet per day (bcf/d), five months before the scheduled date.
Belayim Petroleum Company (Petrobel) announced that it has achieved a new natural gas discovery in the Nile Delta concession area.