GPC Starts Initial Extraction from Al-Hamd Field with 1,500 bbls/d
GPC started its first extraction from Al-Hamd field at the Gulf of Suez concession area with a production rate of about 1500 barrels per day (bbls/d)
GPC started its first extraction from Al-Hamd field at the Gulf of Suez concession area with a production rate of about 1500 barrels per day (bbls/d)
Page 1 of 1