GEMPETCO regains production capacity

Gemsa Petroleum Company (GEMPETCO) succeeded to retain its production capacity back to 500 barrels after a four-year shortage.

The Company conducted chemical clearance technique to the production line in 2010, which was used for the first time in Egypt and the Middle East.

The procedure witnessed remarkable success after using this chemical supplement.

Egypt Oil and Gas newspaper learned that the problem was completely solved completely after the utilization of high-density brushes of 8-inch size to clean up the production line in the company’s concession area. The joint venture company between EGPC and the Egyptian company PICO said that it extracted 500 barrels of waxes and limestone deposits.

Login

Welcome! Login in to your account

Remember me Lost your password?

Lost Password