Italian Eni is set to complete the sixth processing unit of the natural gas field Zohr by the end of February 2019 to boost production to 2.3 billion cubic feet per day (bcf/d) instead of the current 2.1 bcf/d product...
Italian Eni is set to complete drilling the 14th well in Zohr natural gas field by the end of January 2019, a source at the Egyptian Natural Gas Holding Company (EGAS) told Al Shorouk Newspaper. The well, which will b...
The Egyptian General Petroleum Corporation (EGPC) plans to revise the price formula with Italy’s giant Eni for natural gas produced from Zohr field by the end of 2019, based on the development agreement which states r...
Mexican investment has financed 90% of the costs of the pipelines installed in the Zohr natural gas field, the Mexican ambassador to Cairo, Jose Octavio Tripp, has said, according to Al Ahram Newspaper. The ambassador...
The mechanical and electrical installation works for Zohr field’s first and second phases will soon be completed, Egypt Oil & Gas reports. Head of Belayim Petroleum Company (Petrobel) Atef Hassan announced the new...
Italy’s Eni will increase natural gas production from Egypt’s Zohr field by 1.4-1.5 billion cubic feet per day (bcf/d) by the end of 2018, Al Mal News reported. The field’s current production is around 400 million st...
Egyptian President Abdel Fattah El Sisi inaugurated Zohr giant natural gas field in the attendance of Prime Minister Sherif Ismail, Minister of Petroleum and Mineral Resources, Tarek El Molla, and Eni’s CEO, Claudio D...
The Egyptian Minister of Petroleum and Mineral Resources, Tarek El Molla, announced the start of natural gas production from Egypt’s and the Mediterranean’s largest offshore field, Zohr, Egypt Oil & Ga...
Rosneft has closed a $1.125 billion deal with Eni to acquire a 30% stake in the Zohr gas field, Egypt Oil & Gas reports. Rosneft also partially reimbursed Eni for past project costs. Eni retains a 60% stake in the...
Petrojet completed its manufacturing and loading of offshore facilities for the deepwater Zohr field, Egypt Oil & Gas reports. The last component, a 14-inch jumper, has been loaded. It was completed on September 3...