Avouma 2-H Well

  • Vaalco Resumes Production at Avouma 2-H

    Vaalco Resumes Production at Avouma 2-H

    Sunday, 8th January 2017
    Vaalco Energy restarted production at the Avouma 2-H well on the Avouma platform, offshore Gabon, after utilizing a hydraulic workover unit to replace a failed electric submersible pump (ESP) system.
  • Gabon Resumed Production at Avouma 2-H Well

    Gabon Resumed Production at Avouma 2-H Well

    Wednesday, 31st August 2016
    Vaalco Energy’s Avouma 2-H well on the Avouma platform offshore Gabon in the Etame Marin Permit has resumed production at a stable rate, with the well producing approximately 1,850b/d of oil.