Gulfsands Petroleum has completed the drilling operations on the first horizontal development well within the Khurbet East Field (KHE-5H). The KHE-5H well, which flowed oil to surface at an average rate of 2041 barrels of oil per day (bopd) through a 3/8" choke, has been completed and suspended as the fourth oil producer for connection through the Early Production Facility (EPF), scheduled to commence operation by the fourth quarter of 2008.