Tethys and partner CCED (Oman) Ltd (operator) have contracted MB Petroleum LLC to provide the MB 49 work over rig to conduct testing operations on Blocks 3 and 4 onshore Oman. The 450 hp rig is currently being mobilized on Block 3 and testing operations will begin in the next couple of days. The Barik sandstone, which displayed excellent oil shows whilst drilling, was not fully evaluated at the time and will now be tested