Eni Commences Production from Angola’s Cabaça North Development Project

Eni announced that production has started for the Cabaça North development project, which is located in Block 15/06 of the Angolan deep offshore, a press release published by the company remarked.

Eni reported that the project’s peak production rate is expected to reach 15,000 barrels of oil per day (bbl/d). It added also that this project will increase and sustain the production from the plateau of the Armada Olombendo, a zero-discharge, and zero-process flaring FPSO with total capacity of 100,000 bbl/d.

According to the statement, Block 15/06 is operated by Eni Angola with a 36.84% share. Sonangol Pesquisa e Produção (36.84%) and SSI Fifteen Limited (26.32%) compose the rest of the Joint Venture.

It is worth noting that this project is the second start-up achieved by Eni Angola in 2021, after the Cuica Early Production achieved in July. Within the next few months, there will be a third start-up with the Ndungu Early Production in the Western area of Block 15/06.

 

 

Avatar photo

Fatma Ahmed 2419 Posts

Fatma Ahmed is a staff writer with six years’ experience in Journalism. She is working in the field of oil and gas for four years. She also worked in the field of economic journalism for 2 years. Fatma has a Bachelor Degree in Mass Communication.

Login

Welcome! Login in to your account

Remember me Lost your password?

Lost Password