Petrojet Completes TBM Installation for the Metro Line 4 Project
The Ministry of Petroleum and Mineral Resources announced that Petrojet has finalized the installation of the Tunnel Boring Machine (TBM) for the Cairo Metro Line 4 project.
The Ministry of Petroleum and Mineral Resources announced that Petrojet has finalized the installation of the Tunnel Boring Machine (TBM) for the Cairo Metro Line 4 project.
Page 1 of 1