UAE to Continue Diversifying Energy Mix
The country is preparing for fuel load of unit 1 of Barakah Nuclear Energy Plant, which is scheduled to take place between the end of 2019 and early 2020.
The country is preparing for fuel load of unit 1 of Barakah Nuclear Energy Plant, which is scheduled to take place between the end of 2019 and early 2020.
Page 1 of 1