Petrojet and SLB signed a contractors deal to design, supply and operate an early production facilitating station at the Meleiha field.
This comes in line of the aims of the Ministry of Petroleum and Mineral Resources’ strategy to accelerate implementing production projects.
The station is considered a part of the second phase of the Meleiha field in the Western Desert for Agiba Petroleum Company.
The contract was signed by Waleed Lotfy, Petrojet’s Chairman, and Sherif Bayoumy, SLB’s Managing Director for Egypt, Sudan and East Mediterranean
The second phase of the project includes designing, supplying, implementing and testing a gas pipeline which is 20 inches in diameter and 130 km in length. The project further includes designing, supplying, implementing and testing pipeline networks for 19 wells, with a length of 122 km.